The aim of this meeting is to get status of and issues with
current workpackages and to set out what everyone's doing over
the next week.
6th July 2005, 12:00(CEST)/11:00(BST) NPM MJRA4.6 status meeting:
* Actions from previous meeting
* Status of and issues with current workpackages
* Plans for current workpackages
* Holidays/Absences
CERN teleconference +41-22-767 7000, ask for EGEE JRA4.
Conference owner \"Kostas\".
Currently Active Workpackages
=============================
WP1: Revision of Metrics
WP1.1 Determine NOC/GOC requirements
WP1.4 Update Metrics document
WP2: Diagnostic Tool Design and Development
WP2.1 Functional Specification
WP3: NPM Framework Interface Review and Development
WP3.1 Revision of Framework NM-WG Interface
WP3.7 Design NMWG v1 translation layer for GN2:JRA1
WP4: NPM Mediator
WP4.2a Design core components
WP4.2b Design NM-WG interface
WP5: Security
WP5.2 Determine GN2:JRA1 + translation layer requirements
WP6: EGEE NPM Deployment Co-ordination
WP6.1 Assessment of tools to be deployed
WP7: Test deployment
All items on going for duration of MJRA4.6
WP10: Integrate WP7 into gLite Source Control System
WP10.1 Create WP7 entries in gLite repository