LT2 Technical Support Group

Europe/Zurich
Room 532, Blackett Laboratory, IC

Room 532, Blackett Laboratory, IC

Olivier van der Aa
Description
The meeting will be available by VRVS: Motorcycle ROOM
minutes
    • 16:00 16:15
      Brunel Status and how to set into production 15m
      To set Brunel into production they are two options: 1- Change the information in the GOCDB (GIIS_URL and CE1 to monitored) while still into production and run the SFT against it with https://monitoring.egee.man.poznan.pl/admin2/. Could lead to tickets but is immediate 2- Set the site in uncertified mode and wait that the SFT are modified such that they are correctly runned on an uncertified site. More lengthly but will end up with a way to test a site that is uncertified.
      Speaker: Olivier/Paul/Henry/Duncan
    • 16:15 16:30
      QMUL status 15m
      - Situation with DPM. Is the dual homing problem resolved - If ok with 30 GB will try with 20 TB ?
      Speaker: Guiseppe/Alex
    • 16:30 16:45
      General Site issues 15m
      - Put myself in the GOCDB as site-admin. So that I can test sites with the polish tool and/or put downtime if person is away. - SFT failure at UCL-HEP. Authentification error ? - UCL-CCC and firewall changes due to participation in research networks (UKLIGHT). (William). - IC-LeSC. SGE integration details. - Warranty of the GridPP machines. Is the status clear. (A. Fage) - Request at last Dteam meeting for each site to reply the ten easy network questions within 3Weeks. Using document attached please fill wiki at http://wiki.gridpp.ac.uk/wiki/GridPP_Answers_to_10_Easy_Network_Questions
      Speaker: All
      document
    • 16:45 17:00
      T2 Support Plan 15m
      - Objective of the attached xls sheet is to have a cascade of person to contact in case of a given problem occurs within the T2. - Need to fix the categories of problems - Need to fix who will be able to move to other LT2 sites. - Need to fix people availability.
      Speaker: Olivier/All
      document
    • 17:00 17:15
      CHEP abstract 15m
      - Comment on the abstract for CHEP06: "Failure Management in the London Tier2"
      Speaker: ALL
      document